Hospitality           Residential            Office & Fitout           Industrial & Logistics          Urban Planning          Studies          Interior Design         Specials

Office & Fitout 2019

CATTIA BUSINESS INCUBATOR



DISTINCTION @EU MIES AWARD 2021ST PRIZE @BUCHAREST ANNUAL 2020



The function of the building, that of a business incubator in the energy and IT industry, required support functions that influenced the configuration. An urban platform dedicated to events is located at the ground floor, and it has a double role: it partially covers the open parking space and its perforation brings light to the basement. 






Status: Built
Year: 2019
Location:  Brașov, Romania
Client: Brașov Municipality
Built area: 18.250 sqm
Partner in charge: arch. Eliza Yokina
Team: arch. Adrian Soare, arch. Elena Dragu, arch. Irina Plopeanu & Exhibit Arhitectura
Project team with: Exhibit Arhitectura




The functional levels are organized in such a way as to allow flexibility. The architectural intention that generated the overall image is the layout of the three horizontal slabs that split the landscape, while the glass facade filters it. The monolithic reinforce concrete structure provided the advantage of organizing a flexible layout




NEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWSNEWS

02.12.2024
IBIS Făgăraș updates

We are excited to announce the groundbreaking of our ambitious project for the renewal of an existing building within Făgăraș protected area. The proposal seeks to honor the architectural heritage of the site while transforming it into a refined three-star hotel.

08.11.2024
Brasserie at Mita Biciclista
is now open

Cumulus imagined the Brasserie, part of the La Mița Biciclista Creative Establishment as a place open to the city where people can read part of the Mita Biciclista’s personality and the brilliance of the beginning of the century.

17.10.2024
Brick House  1rst prize winner for “Built Architecture/Individual Dwelling Architecture” at AAB2024

The Reclaimed Brick House represents an accurate response to the urban context and the urban planning constraints of the area that shaped this volume on a difficult-to-build lot. The design process involved obtaining several urban planning certificates and strictly respect of all setbacks and regulations of the area, as well as legal requirements

18.09.2024
Cumulus wins 3rd prize @ ”Colentina Lakes” Competition

The competition aimed to develop the landscaping of the Colentina lakeshores over the entire length comprised in the 2nd District. By analyzing the geographical context we discover that Bucharest is not a flat city. Actually, the flat does not exist, there is always a slope of a few centimeters, of a few meters or sometimes of even 10 meters. Therefore, our proposal follows to rediscover the subtle slopes.